Well drilling, fill and plumbing

The well has been drilled by this enormous machine and the footprint of the house has been filled, plumbed and the rebar is down. The power company came out as well and placed stakes in the ground along the long driveway for the placement of the power poles. The inspector came out today to inspect the plumbing so that the foundation can be poured. We are hoping to have the foundation poured tomorrow.


Well Drilling Equipment


Filled Footprint


Plumbing Installed


Ready For Foundation


Stakes For Power Poles