House Update
The top floor is framed, wrapped and now has a roof. Here are some photos of what has been done in the past week and a half.
Front of the house, screened patio is on the right side.
Back of the house, screened patio is on the left side.
Front of the house again with the initial roof structure in place.
Side of the house looking into the screened porch, into the master bedroom and living room.
Front of the house with the roof on.
Back of the house with the roof on. The top right window is my office window. and the bottom left window is the master bedroom.
Front of the house, screened patio is on the right side.
Back of the house, screened patio is on the left side.
Front of the house again with the initial roof structure in place.
Side of the house looking into the screened porch, into the master bedroom and living room.
Front of the house with the roof on.
Back of the house with the roof on. The top right window is my office window. and the bottom left window is the master bedroom.
0 Comments:
Post a Comment
<< Home